End of Life Announcement for
APC Symmetra PX 80kW and NetworkAir
APC Symmetra PX 80kW
APC by Schneider Electric has announced the APC Symmetra PX 80kW will be end of life in 2021. That means after 2021, comprehensive service plan coverage will no longer be available and spare parts inventory will not be guaranteed.
However, there is an option to extend the life of the UPS until the end of 2024. If a Modular Power Revitalization Service (MPRS) is completed in 2019, Schneider Electric will extend the serviceable life of the UPS for 5 years – through 2024.
It’s time to act! The modernization service for the APC Symmetra PX 80kW will be discontinued in 2020. If you want to take advantage of this opportunity, contact us for details and pricing.
APC NetworkAir
Both the APC NetworkAir In row and room air units are either end of life now or will be within the next six months. It’s time to consider replacement of these critical cooling units. Schneider Electric has many options available between APC InRow and Uniflair. Plan to replace your end of life cooling equipment before it fails.
Strategies for energy efficient datacenter cooling have changed significantly over the past 10 years, call us to review your requirement and get recommendations for replacement or upgrade.
For more information about modernization and replacement options for the APC Symmetra PX 80kW and NetworkAir cooling equipment, call 800-876-9373.
Click here for a complete list of models going End of Life.
Follow-us on LinkedIn for the latest news and announcements.
www.power-solutions.com